Rio Tinto

Phase 1 of the project consists of 6 floors, phase 2 will rise to 10 floor. The Cat A works involved are plasterboard perimeter bulkheads / margings with SAS 330 ceilings system.
Thermaline wall lining to the perimeter walls and window reveals.
There are WC cores on East and West that consist of Gyp-lined walls, Internal partitions and plasterboard ceilings with a Coffer bulkhead detail.
There is also the Plant room cores on East and West that consist of Fire rated partitions and acoustic partition
Attributes Values
Location London, England
Construction Date July 2015 - 2016
Project Value £1,500.000
Surface Area The Blackstone Group