Airports

Heathrow Airport IDL

Project comprises the Installation of SAS Fin / Wave suspended ceilings and SAS Raft suspended ceilings throughout the International Departures lounge, an area measuring some 500 metres long by up to 20 metres wide.

Also incorporating new Curved GRG perimeters bulkheads and lighting Troughs.

The entire installation was carried out at night, between the hours of 11:00 pm and 4:00 am, after the Terminal was closed to the public, with the requirement that the Terminal was ready for the public again by 6:00 am the following morning.

Attributes Values
Location Heathrow Airport IDL
Construction Date April 2012 -2013
Project Value £2,000.000
Surface Area British Airways

About Us

Integra have been specializing in the installation of suspended ceiling systems, partition walls, drylining and plastering for over twenty five years.

Recent Projects

Contact Info

Laser House, Cricket Lane Beckenham, Kent, BR3 1LH

020-8639-0500

icl@integracontracts.com